Home › Massachusetts › Stoneham
HVAC in Stoneham, MA
Stoneham has been on the Stretch Code since July 2017 without moving to the Specialized Code, and close to 43% of its homes sit in buildings with more than one unit. Call (978) 691-9005 or use the form. A person reads every request and replies with what happens next.
- Free for homeowners
- State licenses checked first
- Condos and single-family homes
Ask About Heating and Cooling Service in Your Area
Tell us about the home and the system. A person reads it and replies with what happens next.
Please add your name, a 10-digit phone number and a valid email.
Your request didn't go through on our end. Please call (978) 691-9005 so it isn't lost.
Too many requests have come from this connection in a short time. Please call (978) 691-9005 and we'll take it from there.
We couldn't finish the spam check. Wait a moment and send it again, or call (978) 691-9005.
Heating and cooling in Stoneham
Heating and cooling jobs in Stoneham

Heat Pumps & Conversions
Ducted and ductless heat pumps, and moving off oil or propane, with the rebate paperwork in mind.

Furnaces & Boilers
Replacing a tired furnace or boiler, gas or oil, and repairs when the heat quits.

Central Air Conditioning
New and replacement central air for houses that already have ducts, or are getting them.

Ductwork & Maintenance
New or repaired ducts, airflow problems, and the yearly tune-up that keeps equipment running.
Not sure what you need?
(978) 691-9005Tell us whether it's a house or a condo and what heats it today, and we'll help you work out the job.
Permits
HVAC permits in Stoneham
Stoneham's Building Department, on the garden level of Town Hall at 35 Central Street, enforces the building, electrical, gas, mechanical and plumbing codes and takes applications online through OpenGov. It's open until 7 pm on Tuesdays, and inspections are arranged by phone rather than online (Building Department).
- Gas and electric
- National Grid gas, Eversource electric
- Building Department
- 35 Central Street, garden level, 781-279-2670; Monday, Wednesday and Thursday 8 to 4, Tuesday 8 to 7, Friday 8 to noon
- File online
- OpenGov portal; sheet metal application posted by the department
- Inspections
- Call the office
- Gas appliance fee
- $45 each for a gas boiler, furnace or water heater
- Central AC (electrical)
- $50 residential
- Fire Department
- $50 each: oil burner install or removal, tank install or removal, permanent propane (5 years)
Gas and electrical fees. Chapter 5 of the town code requires a permit from the gas inspector before any work starts on gas piping or gas systems. Gas fees start at $45 for up to three fixtures plus $5 for each additional one, and a gas boiler, furnace or water heater is $45 apiece. Permits lapse if work hasn't begun in six months, there are no refunds, and unpermitted work can be charged double on first notice or triple after completion. On the electrical side, residential central air conditioning is listed at $50 (Town Code Chapter 5).
Oil, tanks and propane. The Fire Department issues its own permits: $50 to install an oil burner and $50 to remove one, $50 each to install or remove a tank, both good for 30 days, $50 for a permanent propane installation good for five years, and $50 for temporary propane storage good for 60 days (Fire Prevention Fee Schedule). An oil-to-heat-pump conversion that pulls the burner and the tank can involve several of these alongside the electrical permit.
Energy code. The state's adoption list, as of October 27, 2026, shows Stoneham on the Stretch Code since July 1, 2017 and not on the Specialized opt-in code (energy code adoption by town).
Licensing. Gas fitting and sheet metal licenses can be checked on the state license lookup; we check them before referring anyone.
Last verified November 2026. Fees, restrictions and deadlines on this page are due for re-checking by May 2027. New England HVAC Service is a referral service. We don't pull permits or install equipment; the licensed contractor files the permit.
Stoneham's housing
Single-family streets and large condo buildings
Stoneham's Housing Production Plan counts 57.1% of homes as single-family and 42.9% in buildings with more than one unit, and nearly half of those multifamily units are in complexes of 20 or more. It says most of the town's housing was built after 1960, while warning that older buildings may lack efficient heating and cost more to run and maintain (Housing Production Plan).


In a condo complex, a heat pump or new condenser usually means a conversation with the association about where outdoor units and line sets can go, and a ductless system is often simpler than adding ducts between units. Along Sweetwater Brook, including parts of the Montvale Avenue area that flood repeatedly, it's worth checking the flood zone before setting an outdoor unit or a tank (Open Space and Recreation Plan). The same plan lists five National Register districts, including Nobility Hill and Central Square, and mentions no local historic district commission.
Gas and electric
Eversource, National Grid and the town's electricity program
The state's utility lists put Stoneham in National Grid's gas territory and Eversource's electric territory (gas, electric). Through Stoneham Community Electricity Aggregation, the town buys electricity supply for residents; newly eligible customers get a letter and are enrolled unless they opt out, those already with a third-party supplier aren't moved, and Eversource still delivers power and sends the bill (Community Electricity Aggregation).
A house heated by a heat pump can get Eversource's seasonal heat pump rate, which lowers distribution and transmission charges on all household electricity from November 1 to April 30. Homes that took a qualifying Mass Save heat pump rebate on or after January 1, 2019 are enrolled automatically, others apply, and the updated winter rate starts November 1, 2026 (seasonal heat pump rates). Electric baseboard, space heaters and electric furnaces don't qualify, and a heat pump water heater on its own doesn't either (Eversource heat pump rate).
FAQ
Stoneham heating and cooling questions
How are HVAC permits filed in Stoneham?
Applications go in online through the town's OpenGov portal, and the Building Department posts a separate sheet metal application for duct and air handler work. Inspections aren't booked online: the department asks you to call the office at 781-279-2670.
What does a gas furnace or boiler permit cost in Stoneham?
The town code lists a gas boiler, gas furnace or gas water heater at $45 each, with a $45 minimum covering up to three fixtures and $5 for each one after that. A permit lapses if work hasn't started within six months, and work done without one can be charged double, or triple once it's finished.
What does the Fire Department charge for oil and propane work?
Its posted fee schedule lists $50 each to install or remove an oil burner, $50 each to install or remove a tank, and $50 for a permanent propane installation, which is good for five years.
Has Stoneham adopted the Specialized Energy Code?
No. As of the state's October 27, 2026 list, Stoneham follows the Stretch Code, in effect there since July 1, 2017, and has not opted into the Specialized Code.
What does it cost me to use New England HVAC Service?
Nothing. The request and the referral are free; the contractor prices the job.
Nearby