New England HVAC Service home

Home › Massachusetts › Lexington

HVAC in Lexington, MA

Lexington's Fossil Fuel Free bylaw keeps new gas and oil piping out of new homes, major renovations and large additions, though an existing heating system can still be replaced. Call (978) 691-9005 or use the form. A person reads every request and replies with what happens next.

  • Free for homeowners
  • State licenses checked first
  • Battle Green to Peacock Farm

Ask About Heating and Cooling Service in Your Area

Tell us about the house and the system. A person reads it and replies with what happens next.

Your details go to New England HVAC Service only, so we can reply. We would share them with a contractor only if one becomes available for your area and you agree. Privacy

How your request is handled: it comes to New England HVAC Service. We review it and reply by the next business day. No participating HVAC contractor covers this area yet, so we can't promise a contractor introduction. If you smell gas, get out and call 911 or National Grid at 1-800-233-5325. If a carbon monoxide alarm sounds, leave the house and call the fire department from outside. No heat in a cold snap? Call an HVAC contractor directly.

Permits

HVAC permits in Lexington

In Lexington, gas, plumbing and electrical permits come from the Building Office and are filed through the town's OpenGov portal; the plumbing and gas inspector and the electrical inspector work by appointment (Building Office).

Gas
National Grid
Electric
Eversource
Inspectors
Plumbing and gas 781-698-4513; electrical 781-698-4512; by appointment
Office hours
Monday, Wednesday, Thursday 8:30 to 4:30; Tuesday 8:30 to 7; Friday 8:30 to 1
Electrical fee
$25 per $1,000 of work; $40 minimum for all permits
Energy code
Specialized Code since January 1, 2024
Fossil Fuel Free bylaw
In effect since March 21, 2024

Fees. The fee schedule approved by the Select Board on May 23, 2022 and in effect since September 1, 2022 sets electrical permits at $25 per $1,000 of work, a $40 minimum for all permits, and a $50 reinspection fee paid in advance (Fee Schedule). For a heat pump, the new circuit is usually the electrical permit, alongside whatever the rest of the job needs.

Oil and propane. In Massachusetts, installing or altering oil burning equipment and oil storage is a local fire department permit on Form FP-056, and removing a tank uses Form FP-292; ask the Lexington Fire Department about its process and fees, and about propane storage.

Noise from equipment. Lexington's noise bylaw names HVAC equipment outright: excessive or unwarranted noise from "air conditioners, pumps, fans, furnaces, compressors" and similar fixed plant equipment is prohibited, and raising the level 10 dBA or more above the ambient sound, or 3 dB in one octave band for a tonal sound, counts as noise pollution (Chapter 80). Where the condenser goes, and how quiet it is, is part of the design here.

Historic districts. The Historic Districts Commission reviews what can be seen from a public way in four local districts, Battle Green, East Village, Hancock-Clarke and Munroe Tavern, covering about 2,000 properties, with applications filed through OpenGov (Historic Districts Commission, guidelines). The town also has two neighborhood conservation districts, Turning Mill and Pierce-Lockwood (Current NCDs).

Last verified November 2026. Fees, restrictions and deadlines on this page are due for re-checking by January 2027. New England HVAC Service is a referral service. We don't pull permits or install equipment; the licensed contractor files the permit.

Lexington's homes

Single-family houses from every decade, many of them mid-century

About 82% of Lexington's housing units are single-family homes. The town's 2025 Housing Needs Assessment dates 22% of units to 1939 or earlier, 24% to 1940–1959, 23% to 1960–1979, 14% to 1980–1999 and 18% to 2000 or later (Housing Needs Assessment). The Historical Commission points to the town's mid-century modern neighborhoods, Moon Hill, Five Fields and Peacock Farm (Historical Commission).

Brick Federal-style house with a pedimented porch, yellow shrubs and a green lawn
Low mid-century modern house among tall pines with a red Japanese maple

With about two-thirds of homes built before 1980, many Lexington projects are a replacement or a heat pump added to an older house. Under the Fossil Fuel Free bylaw, the size of the job matters: swapping out an existing boiler is allowed, but once a renovation alters more than half the house or an addition is large enough to qualify, the new work can't add gas or oil piping or appliances, so the heating plan should be settled before the renovation plan is.

Energy rules

The Fossil Fuel Free bylaw and the Specialized Code

Lexington moved from the Stretch Code, which it had used since January 1, 2011, to the Specialized Energy Code on January 1, 2024, according to the state's list as of October 27, 2026 (energy code adoption by town).

On top of that, Lexington's Fossil Fuel Free Demonstration Program bylaw has been in effect since March 21, 2024. New construction, renovations that alter more than half of a home, residential additions or changes of use over 1,000 square feet, and additions larger than the existing conditioned area may not add on-site fossil-fuel piping or appliances. Exempt are changes to existing heating systems that add no new fossil piping, backup generators, outdoor cooking and heaters, and repairs to unsafe pipes. Multifamily buildings over 12,000 square feet that use gas only for hot water are exempt if the permit is filed before January 1, 2027. Waivers come from the Building Commissioner (Fossil Fuel Free Demonstration Program).

Utilities. National Grid supplies gas and Eversource electricity, with no municipal light plant (gas, electric). Lexington is one of the municipalities in Mass Save's 2025–2027 Community First Partnership (Community First Partnership). Eversource's seasonal heat pump rate gives a discount on all usage from November 1 to April 30 and starts the day after sign-up (seasonal heat pump rates), and Lexington Community Choice offers three supply options, two of them 100% renewable, with Eversource still delivering the power (Lexington Community Choice).

FAQ

Lexington heating and cooling questions

Can I still replace a gas boiler or furnace in Lexington?

Yes. The Fossil Fuel Free bylaw exempts changes to an existing heating system that don't add new fossil-fuel piping. It applies to new construction, renovations that alter more than half of a home, residential additions or changes of use over 1,000 square feet, and additions larger than the existing conditioned area.

Does Lexington regulate noise from heat pumps and air conditioners?

Yes. Chapter 80 of the town code prohibits excessive or unwarranted noise from fixed plant equipment, naming air conditioners, pumps, fans, furnaces and compressors, and treats raising the sound level 10 dBA or more above the background as noise pollution.

Does an outdoor unit in a historic district need approval?

The Historic Districts Commission reviews changes visible from a public way in the Battle Green, East Village, Hancock-Clarke and Munroe Tavern districts, about 2,000 properties in all, and takes applications through OpenGov. If the unit would be visible from the street, apply before it goes in.

How much is an electrical permit for a heat pump circuit?

Lexington's fee schedule, in effect since September 1, 2022, charges $25 per $1,000 of electrical work with a $40 minimum for all permits, and a $50 reinspection fee paid in advance.

What does it cost me to use New England HVAC Service?

Nothing. The request and the referral are free; the contractor prices the job.

Nearby

HVAC referrals in towns next to Lexington

Massachusetts HVAC rules and every town we cover →

Heating or cooling project in Lexington? Describe the job.

Call (978) 691-9005
Call NowSend a Request