Home › Massachusetts › Andover
HVAC in Andover, MA
Andover moved new homes onto the Specialized Energy Code on July 1, 2026, charges a $50 electrical permit for each heat pump or mini-split, and now wants a printed building card on site before work begins. Call (978) 691-9005 or use the form. A person reads every request and replies with what happens next.
- Free for homeowners
- State licenses checked first
- Ballardvale to Shawsheen Village
Ask About Heating and Cooling Service in Your Area
Tell us about the house and the system. A person reads it and replies with what happens next.
Please add your name, a 10-digit phone number and a valid email.
Your request didn't go through on our end. Please call (978) 691-9005 so it isn't lost.
Too many requests have come from this connection in a short time. Please call (978) 691-9005 and we'll take it from there.
We couldn't finish the spam check. Wait a moment and send it again, or call (978) 691-9005.
Heating and cooling in Andover
Start with the type of work

Heat Pumps & Conversions
Ducted and ductless heat pumps, and moving off oil or propane, with the rebate paperwork in mind.

Furnaces & Boilers
Replacing a tired furnace or boiler, gas or oil, and repairs when the heat quits.

Central Air Conditioning
New and replacement central air for houses that already have ducts, or are getting them.

Ductwork & Maintenance
New or repaired ducts, airflow problems, and the yearly tune-up that keeps equipment running.
Unsure of the job?
(978) 691-9005Tell us how the house heats and cools now and what you want instead, and we'll help you name the work.
Permits
HVAC permits in Andover
Andover's Building Division includes the electrical and plumbing and gas inspectors, and takes applications through its Online Permit Center, OpenGov and ViewPoint Cloud portals. Permits are picked up weekdays from 7:00 to 3:30, and from May 1, 2026 contractors must collect a printed building card before starting, keep it on site with the approved plans, and expect a failed inspection and a reinspection fee if it's missing; a second copy of the card is $100 (Building Division).
- Gas and electric
- Eversource gas, National Grid electric
- File online
- Online Permit Center, OpenGov and ViewPoint Cloud
- Heat pumps and mini-splits
- $50 per unit on the electrical permit
- Gas
- $50 plus $5 per fixture for replacement; $100 plus $5 for new
- Building card
- Required on site from May 1, 2026
- No permit
- 200% of the electrical fee
Electrical fees. The residential electrical schedule, last modified May 9, 2025, charges $50 per unit for heat pumps and for mini-splits, $60 for a 200-amp service upgrade plus $20 for each 100 amps above that, and $125 for a standby generator. The minimum is $50, a re-inspection is $50, an after-hours inspection is $400, and working without a permit costs 200% of the fee (Residential Electrical Permit Fees).
Gas fees. Revised March 14, 2024, Andover's plumbing and gas schedule charges $50 plus $5 per fixture for replacement-only work in a home, $100 plus $5 per fixture for a new appliance, and $25 for a gas water heater (Plumbing and Gas Permit Fees). The town's sheet metal fees are in a scanned schedule we couldn't read, so your contractor will confirm that one.
Fire Prevention. Fire Prevention at 36 Bartlet Street issues fire permits under state law, runs the annual flammable fuel storage permit program, and takes applications online (Fire Prevention). It doesn't post fees for oil burners, tanks or propane.
Historic districts. In the Ballardvale Historic District, a Certificate of Appropriateness is required before any work visible from a public way, and applications can be filed online (Ballardvale Historic District Commission). The Central Street Historic District, created by Town Meeting on April 30, 2025 for 39 properties on upper Central Street, reviews certain exterior alterations and exempts solar panels, fences and paint color among other items (2025 Town Meeting recap); its treatment of outdoor HVAC equipment isn't spelled out there.
Last verified November 2026. Fees, restrictions and deadlines on this page are due for re-checking by January 2027. New England HVAC Service is a referral service. We don't pull permits or install equipment; the licensed contractor files the permit.
Energy code and programs
Specialized Code, Community First and town power
Specialized Energy Code. Town Meeting adopted the Specialized Energy Code on April 30, 2025 for new residential and commercial buildings over 1,000 square feet, built to HERS or Passive House paths. The town says it doesn't ban natural gas but encourages designs that rely less on fossil fuels, and existing buildings, large additions and historic structures remain on the Stretch Code (2025 Town Meeting recap). The state lists Andover's Specialized Code as effective July 1, 2026 (energy code adoption by town).
Community First. Andover shares a Mass Save Community First partnership with Methuen, Eversource and National Grid, with no-cost assessments for one- to four-unit homes, 75 to 100% off approved insulation, no-cost targeted air sealing and no-cost heating system replacement for income-eligible households (Methuen and Andover partnership).
Gas and power. Andover's gas franchise is held by Eversource Gas Company of Massachusetts and its electricity comes from National Grid (state gas franchise list); Andover was one of the three communities hit by the Columbia Gas overpressurization of September 13, 2018 (City of Lawrence archive). Andover Community Power's default Standard rate is 13.905 cents per kWh through December 2027 meter reads (Andover Community Power).
Andover's homes
Mostly single-family, a third from before 1960
Andover's 2025–2030 Housing Production Plan says more than a third of the town's homes were built before 1960 and 8% after 2010. About 70% are detached single-family houses, 5% attached and 3% two-families, spread across areas the plan names such as Ballardvale, Shawsheen Village, downtown and River Road (Housing Production Plan).


Because the Specialized Code reaches only new construction, replacing a furnace or adding heat pumps in an existing Andover house stays under the Stretch Code. In an older house the bigger questions are whether to keep gas, add heat pumps or do both, and, in Ballardvale, whether the outdoor unit will be visible from a public way, since that brings the job before the Historic District Commission.
FAQ
Andover heating and cooling questions
What does a heat pump permit cost in Andover?
Andover's residential electrical fees, last modified May 9, 2025, charge $50 per unit for heat pumps and $50 per unit for mini-splits, with a $50 minimum. Working without a permit costs 200% of the fee.
Does Andover's Specialized Energy Code ban gas?
No. The town's recap of the April 30, 2025 Town Meeting says the code doesn't ban natural gas but encourages design choices that reduce reliance on fossil fuels. It applies to new buildings over 1,000 square feet; existing homes and large additions stay on the Stretch Code.
What is the building card rule?
Since May 1, 2026, contractors must pick up a printed building card from the Building Division before starting work and keep it, with the approved plans, on site. If the card isn't there at inspection, the inspection fails and a reinspection fee applies. A second copy is $100.
Do Andover's historic districts review outdoor equipment?
In Ballardvale, a Certificate of Appropriateness is needed before any work visible from a public way. The newer Central Street district reviews certain exterior alterations and exempts solar panels, but the town's summary doesn't say how it treats condensers, so check before placing one there.
What does it cost me to use New England HVAC Service?
Nothing. The request and the referral are free; the contractor prices the job.
Nearby